Veolia Djur summarizes the projects completed in 2025, which have already recorded tangible and factual results.
- Aragats, Armavir Province: 16 km of new water pipeline, 680 subscribers, prevention of 17 l/s water loss, 51% revenue growth.
- Sasunik, Aragatsotn Province: 12 km of new water pipeline, 490 subscribers, prevention of 40 l/s water loss, 25% revenue growth.
- Kasakh: 21 km of new water pipeline, 842 subscribers, prevention of 15 l/s water loss.
- Proshyan: 23.5 km of new water pipeline, 1,180 subscribers, prevention of 15 l/s water loss.
- Spitak: About 2 km of new water pipeline, 130 subscribers, prevention of 10–15 l/s water loss.
- Stepanavan: 9 km of new water pipeline, 250 subscribers, prevention of 8–10 l/s water loss.
- The "Yerevan" Operational Directorate reconstructed 16.9 km of water pipelines and 5.25 km of sewer lines.
- The "South" Operational Directorate reconstructed 22.7 km of water pipelines and 162 meters of sewer lines.
- The "North" Operational Directorate reconstructed 10.58 km of water pipelines and 3.15 km of sewer lines.
These are not merely numbers and statistics; they are clear proof of massive investments and systemic reforms. The completed works have already yielded tangible results, turning into dozens of kilometers of reconstructed networks and a real improvement in the quality of life for thousands of subscribers. In the near future, we will share more details about each of these projects on our page.