The water pipeline supplying the Daily Regulating Reservoir (DRR) of the Lusadzor community in Tavush Province was transferred to Veolia Djur with numerous defects. As a result, breakdowns occurred in the system 2 to 3 times a month. Since the pipeline passed through rocky and hard-to-reach terrain, any technical intervention and repair work became extremely difficult. To provide a permanent solution to the issue, the "Ijevan" operational site of Veolia Djur replaced the pipeline using its own resources.
Specialists constructed and have already commissioned a new system consisting of 400 linear meters of polyethylene and 140 linear meters of steel pipelines. As a result of this upgrade, a stable water supply will be ensured in Lusadzor, and the Veolia team will no longer have to carry out emergency repairs under such challenging conditions.